Skip to content
Pricing & Bidding

Window cleaning price calculator

Window work is priced per pane almost everywhere, but the pane is not what varies — access is. This calculator starts from a pane count and a minutes-per-pane figure, then applies the two multipliers that genuinely change the job: how you reach the glass, and how many storeys up it is.

Before you quote

  • Count panes from outside, then again from inside
  • Note every window you cannot reach from the ground
  • Ask about screens and tracks before you quote

After the first job

  • Record the real time on the first job and correct the rate
  • Photograph any glass that was already scratched
  • Offer the recurring frequency while you are still on site
Flat illustration: a tall window pane seen head-on
Window cleaning price calculator — the inputs are yours; the arithmetic is the same every time.

Counting panes without arguing later

Count each sash or fixed light as one pane, and count inside and outside separately if you are cleaning both. A French door is not one window. Write the count into the quote so the number is agreed before the ladder comes off the van.

Two and a half minutes a pane is a reasonable starting figure for ordinary residential glass with a pole. Detailed sash windows with glazing bars run at double that and should be counted as such.

Access, not height, is the cost

Reaching a first-floor window from the ground with a pole is barely slower than a ground-floor pane. Reaching the same window from a ladder over a conservatory roof is a different job with a different risk profile, which is why the access multiplier in this calculator moves the price far more than the storey count does.

Anything that needs a ladder on soft ground, over glass, or above a slope is a job to price properly or refuse. A fall costs more than every window on the street is worth.

Screens, tracks and the call-out

Screens and tracks are separate line items because they are separate work: pulling, washing and refitting a screen has nothing to do with the glass. Price them per unit and say so.

The call-out line covers setting up and packing down. On a small job it is most of the profit, which is why a four-pane job at a per-pane price is a job you should not be doing.